LIVE · JUNE 16–17

Meet us at EPC 2026 · Booth A20 · George R Brown Convention Center, Houston

Learn More →
EPC 2026 · Houston · June 16–17

Digital Thread for
Major Energy Projects

From FEED through commissioning — turn 12,000 requirements and 400 PDFs into a single governed spine your owners, EPCs, and auditors can all trust.

FEED ITB MDR / TDR PHMSA FERC API OSHA PSM
Download the whitepaper Book a meeting at EPC
FEED CONTRACT EXECUTION TURNOVER

You've said it yourself

We hear the same four sentences from owners, EPCs, and commissioning teams at every major project kickoff.

"Your FEED package has 12,000 requirements across 400 PDFs."
"Your EPC contract has change orders every week."
"Your commissioning team is chasing tag-level compliance manually."
"Handover documentation is a scramble."

A three-layer digital thread

Capture the spec, govern the requirements, execute the engineering — each in the tool built for the job, linked end-to-end.

01 · Capture

AI extraction of spec packages

FEED documents, ITB packages, and vendor data sheets are parsed into structured requirements — numbered, classified, and ready for review — in hours instead of weeks.

02 · Govern

Polarion as the requirements backbone

Every requirement is traced to its P&ID tags, contract deliverables, and commissioning checks. Change orders are impact-assessed against live traceability — not memory.

03 · Execute

Teamcenter for engineering & BOM

Engineering deliverables, BOMs, and vendor documents live in Teamcenter — connected to the Polarion requirement they satisfy, and the handover dossier they populate at turnover.

What this looks like on a real project

Five places Corbinsoft typically plugs in on major energy capital projects.

Owner Requirements Management A single governed source of truth for owner technical specifications — flowed down to every EPC and sub-contractor with traceability intact.
EPC Contract Compliance Every contract deliverable linked to the originating requirement. Change orders, impact assessments, and progress claims all backed by live data.
Commissioning & Turnover Tag-level MDR/TDR readiness. Every loop, every valve, every vessel — verified against its requirement before turnover, not after.
Brownfield Modifications Treat tie-ins and revamps as delta requirements against the existing baseline. Modification impact is traceable, not tribal.
Regulatory Compliance PHMSA, FERC, API standards, OSHA PSM — evidence generated from the same requirements data operations will inherit at handover.

Trusted by major energy operators

"We've implemented Polarion for large Energy Solutions and Oil & Gas companies."
Corbinsoft — Siemens Channel Partner in Sales and Services

Digital Thread for Major Energy Projects

Share a few details and we'll unlock the whitepaper — and reach out if you'd like to meet in person at EPC 2026.

Thank you — your whitepaper is ready.

We've also sent a copy to the email you provided. If you'd like to meet at EPC 2026, just reply.

Download PDF